⏱ 1 min 30 read
Background
The municipality of Moudon, in the canton of Vaud, set up Moudon Energies SA in 2022 to develop district heating. According to a 2023 municipal proposal, the municipality holds 49,95 % of its capital and Romande Energie 50.05 %. The proposal placed the future plant in the Bronjon industrial zone. This area already hosts the waste collection centre and a wood-chip shed belonging to the Coopérative Bois-énergie Jorat-Broye.
The key points
The municipality of Moudon, Moudon Energies SA and the cooperative Bois-Energie Jorat-Broye are submitting a new wood-chip district heating plant to public consultation. The facilities are planned in the En Bronjon industrial zone, according to the Official Gazette of the canton of Vaud, as reported by La Liberté on 18 November 2026.
The file can be consulted until 17 December 2026. Objections and comments must be submitted within the same period. In 2023, the municipal executive proposed granting Moudon Energies SA a 50-year building right over about 1,200 m², for a minimum fee of 8,400 francs per year.
Key figures
- 17 December 2026 : end of the public consultation period
- 50 years : term of the building right proposed in 2023 to Moudon Energies SA
- 1,200 m² : approximate area of this building right
- 8,400 francs : minimum annual fee set out in the 2023 proposal
What it means for businesses
- En Bronjon industrial zone : a new energy facility is planned in the area.
- Wood sector : the project involves the cooperative Bois-Energie Jorat-Broye, already present on the site.
What's next
- 17 December 2026 : close of the public consultation and of the objection period.
Further reading
Sources
- Municipality of Moudon – Proposal No. 50/23, building right in favour of Moudon Energies SA (official source)
- La Liberté – A new heating plant goes to public consultation in Moudon
Let’s share Romandy’s news
We build the news together.
An idea, an opinion, a wish, a detail to add? Tell us!

