⏱ 2 min read
Background
The Pierre-de-Coubertin stadium, on the lakeshore at Vidy, is due to replace the ageing Pontaise stadium as part of the City of Lausanne’s Métamorphose project. It will host, among other events, the Athletissima athletics meeting. The transformation project has already been revised several times, in consultation with a committee of the municipal council.
The key points
Lausanne’s executive submitted a revised report and proposal to the municipal council on 23 November 2026. The 12,000-seat stadium would be moved 10 to 20 metres to the east to preserve the wooded strip and the fair-play area. The upper stands would be built in timber.
According to the office of mayor Grégoire Junod, timber improves the project’s reversibility and reduces embodied energy. Three ecological offsets are planned: a lagoon of around 8,000 m², the renaturation of 300 metres of shoreline and a basin in the Vallée de la Jeunesse. A football hub will offset the loss of a neighbouring pitch.
Key figures
- CHF 5.65 million : credit requested to continue the studies
- 12 000 : seats planned in the transformed stadium
- 1200 : residents expected from 2034 in the third phase of the Plaines-du-Loup eco-district, on the Pontaise site
What it means for businesses
- Construction and timber industry : a partly timber-built venue, under study until the municipal council decides
- Plaines-du-Loup : the Pontaise site freed up for housing, businesses and public facilities
What's next
- Committee report followed by a municipal council decision, dates to be set
- Stadium opening planned for 2032
Further reading
Sources
- City of Lausanne – A consolidated project for the future Pierre-de-Coubertin athletics stadium (official source)
- SWI swissinfo.ch (Keystone-ATS) – Lausanne: Coubertin stadium to be moved 10 to 20 metres
- Le Temps – In Lausanne, the Coubertin stadium project shifts east to preserve its trees
Let’s share Romandy’s news
We build the news together.
An idea, an opinion, a wish, a detail to add? Tell us!

