⏱ 1 min 30 read
Background
In Boudry (Neuchâtel), the Chemin des Écoliers links the CFF station plateau to the Vauvilliers school and the lower town. This path, with a 40-metre difference in height, is badly deteriorated. The Municipal Council proposed renovating it and building a panoramic lift with a footbridge offering a viewpoint.
The key points
The Boudry General Council approved on 16 November 2026 a credit of 865,000 francs to renovate the Chemin des Écoliers and carry out a geological study. It removed the lift from the project, on the basis of an amendment from the Social Democratic Party.
The Municipal Council had requested a credit of 3.44 million francs, according to RTN. The amendment, also backed by the FDP and the Greens, was accepted by 39 votes to one. According to ArcInfo, all groups find the lift project appealing but not mature enough.
Key figures
- 865,000 francs : credit approved for the renovation of the path and the geological study
- 3.44 million francs : initial credit requested by the executive, including the lift
- 39 votes to 1 : vote on the amendment and the amended decree
- 40 metres : difference in height along the Chemin des Écoliers
What it means for businesses
- Civil engineering companies : a renovation project and a geological study are funded by the approved credit.
- Lower-town shops : the direct link with the station area remains a project.
What's next
- The executive must develop its lift project further; if it goes ahead, it will be at a later stage.
Further reading
Sources
- RTN – Yes to the Chemin des Écoliers, no to the lift in Boudry
- ArcInfo – Boudry: ambitious lift project postponed
Let’s share Romandy’s news
We build the news together.
An idea, an opinion, a wish, a detail to add? Tell us!

