Genève Infos, News from Geneva and Romandy

Genève Infos
  • Home  
  • Moiry dam: a 9-metre raising planned for winter power
- News

Moiry dam: a 9-metre raising planned for winter power

Les Forces Motrices de la Gougra prévoient de surélever le barrage de Moiry de neuf mètres, a rapporté Rhône FM le 17 novembre 2026.

⏱ 1 min 30 read

Background

The Moiry dam is located in the Val d'Anniviers, in Valais. It is operated by Forces Motrices de la Gougra. According to Rhône FM, having more hydroelectric power in winter strengthens security of supply. Raising a dam makes it possible to store more water to turbine during that season.

The key points

Forces Motrices de la Gougra plan to raise the Moiry dam by nine metres, Rhône FM reported on 17 November 2026. The aim is to increase its storage capacity by 15 % and to produce more electricity in winter.

The technical studies are due to be completed in early 2027. The project also includes redeveloping access routes and tourist facilities at the site; the existing restaurant will have to be moved. Talks are under way with environmental associations on compensation measures.

Key figures

  • 9 metres : planned raising of the dam
  • 15 % : expected increase in storage capacity

What it means for businesses

  • Electricity supply : more hydroelectric power available in winter
  • Tourism in the Val d'Anniviers : access routes, facilities and the site's restaurant will be redeveloped

What's next

  • Technical studies to be completed in early 2027 ; construction could start in 2029, if all permits are obtained

Further reading

Sources

tout de bon

Let’s share Romandy’s news

We build the news together.

An idea, an opinion, a wish, a detail to add? Tell us!

© 2025–2026 Genève Infos · Geneva