⏱ 1 min 30 read
Background
The Moiry dam is located in the Val d'Anniviers, in Valais. It is operated by Forces Motrices de la Gougra. According to Rhône FM, having more hydroelectric power in winter strengthens security of supply. Raising a dam makes it possible to store more water to turbine during that season.
The key points
Forces Motrices de la Gougra plan to raise the Moiry dam by nine metres, Rhône FM reported on 17 November 2026. The aim is to increase its storage capacity by 15 % and to produce more electricity in winter.
The technical studies are due to be completed in early 2027. The project also includes redeveloping access routes and tourist facilities at the site; the existing restaurant will have to be moved. Talks are under way with environmental associations on compensation measures.
Key figures
- 9 metres : planned raising of the dam
- 15 % : expected increase in storage capacity
What it means for businesses
- Electricity supply : more hydroelectric power available in winter
- Tourism in the Val d'Anniviers : access routes, facilities and the site's restaurant will be redeveloped
What's next
- Technical studies to be completed in early 2027 ; construction could start in 2029, if all permits are obtained
Further reading
Sources
Let’s share Romandy’s news
We build the news together.
An idea, an opinion, a wish, a detail to add? Tell us!

