Genève Infos, News from Geneva and Romandy

Genève Infos
  • Home  
  • Terrassière in Geneva: a temporary layout curbs traffic
- News - Urban planning & major projects

Terrassière in Geneva: a temporary layout curbs traffic

Pending this final project, the City is installing a temporary layout, with works running from 26 October 2026 to March 2027.

⏱ 2 min read

Background

Rue de la Terrassière links the Eaux-Vives station with the Rive area, in the city of Geneva. Although intended mainly for local access, it currently carries heavy through traffic. In 2023, the City of Geneva approved a 2-million-franc study credit for a green, pedestrianised street, from facade to facade.

The key points

Pending this final project, the City is installing a temporary layout, with works running from 26 October 2026 to March 2027. It includes planters, a pergola with misting, shaded areas, drinking fountains, terraces, benches and bicycle racks.

Motor traffic is now reserved for residents, shopkeepers, deliveries, taxis and emergency services. The first section of Route de Chêne has been closed since 16 November 2026 and will become a pedestrian zone. Rue du Parc has been a dead end since 2 November 2026. The tram runs normally throughout the works.

Key figures

  • 2 million francs : study credit approved in 2023 for the final project
  • March 2027 : planned completion of the temporary layout works

What it means for businesses

  • Shops on the street : motor access maintained, including deliveries
  • Customers arriving by car : removed spaces offset in the Villereuse and Eaux-Vives station car parks
  • Cafés and restaurants : new terraces and two small squares at each end of the street

What's next

  • Monitoring will assess the effects of the measures before the final project

Further reading

Sources

tout de bon

Let’s share Romandy’s news

We build the news together.

An idea, an opinion, a wish, a detail to add? Tell us!

© 2025–2026 Genève Infos · Geneva