Genève Infos, News from Geneva and Romandy

Genève Infos
  • Home  
  • Neuchâtel-Frasne line: the connection to the Paris TGV under threat
- News

Neuchâtel-Frasne line: the connection to the Paris TGV under threat

According to Swiss Federal Railways (SBB), the journey between Neuchâtel and Frasne has become three minutes longer in one year, due to deteriorating rails.

⏱ 1 min 30 read

Background

The direct link between Neuchâtel and Paris was discontinued in 2013. Since then, the cross-border Neuchâtel-Frasne line has made it possible to reach the French capital with a single change, at Frasne, onto the TGV coming from Lausanne. It is used by some 85,000 passengers a year, according to RTS. The Transjuralpin Federation is raising the alarm about the state of the tracks, particularly between Les Verrières and Pontarlier.

The key points

According to Swiss Federal Railways (SBB), the journey between Neuchâtel and Frasne has become three minutes longer in one year, due to deteriorating rails. If the trend continues, the connection with the TGV to Paris may no longer be guaranteed. Routes via Lausanne or Geneva take longer.

The Bourgogne-Franche-Comté region acknowledges significant deterioration of the French rail network and a marked risk for this link. In October 2026, the Swiss and French authorities submitted an application for an Interreg study to assess the state of the infrastructure and prioritise the works. How the costs will be shared between Switzerland and France remains to be determined.

Key figures

  • 85 000 : passengers per year on the Neuchâtel-Frasne line
  • 3 minutes : increase in journey time in one year, according to SBB
  • 2013 : end of the direct Neuchâtel-Paris link

What it means for businesses

  • Neuchâtel businesses : their rail access to Paris with a single change depends on keeping the connection at Frasne

Who says what

  • Olivier Baud (head of the Transport Department of the canton of Neuchâtel): the study report will be ready at the end of 2028 and will show where to invest
  • Transjuralpin Federation : it calls for the renovation of the rail infrastructure

What's next

  • Report of the Interreg study on the state of the tracks expected at the end of 2028.

Further reading

Sources

tout de bon

Let’s share Romandy’s news

We build the news together.

An idea, an opinion, a wish, a detail to add? Tell us!

© 2025–2026 Genève Infos · Geneva