⏱ 1 min read
Background
Since December 2019, Geneva public transport's tram line 17 has served Gaillard, Ambilly and Annemasse from the Moillesulaz border crossing. It is the second busiest tram line on the TPG network.
The key points
The second phase of the tram 17 extension to the Le Perrier district in Annemasse was inaugurated on 17 October 2026. The new section has three stations, after three years of works.
The extension has been welcomed with enthusiasm by residents, according to the Tribune de Genève. It is to strengthen connections with the Tango bus rapid transit line and limit car traffic around the tram.
Key figures
- Length of the new section: 1.2 km, with three new stations.
- Journey time from Moillesulaz: 12 minutes.
- Line 17 ridership: 11,000 passengers a day.
- Contribution from the Haute-Savoie department: around 16 million euros, or 34% of the cost.
What it means for businesses
The place Deffaugt station serves shops in central Annemasse. The project is linked to the town's plan to pedestrianise the centre.
Who says what
Martial Saddier, president of the Haute-Savoie departmental council, inaugurated the section with several departmental councillors. The department sees it as a lever to increase the shift to public transport.
What's next
A park-and-ride with 200 car spaces and 70 bicycle spaces is planned at the new terminus. The department is funding 44% of it.
Further reading
Sources
- Tribune de Genève – Tram 17: line extended to Le Perrier in Annemasse
- Haute-Savoie department – Inauguration of the Annemasse tram extension
Let’s share Romandy’s news
We build the news together.
An idea, an opinion, a wish, a detail to add? Tell us!

